Français English
Security Metal nets rockfall

Acrobatic work


Job
Excavator work
State of play of structures
Removal of a tree of 40 meters

See all the news

 

Evènementiel

more informations

 

 


 

 

 

 

» » » Maintenance of floodgates Tignes
Export in pdf  Export in pdf


 

Maintenance du barrage de Tignes

Maintenance :

 

Working in both the urgency of planned intervention CITEM meets present throughout the national territory with the same interest and the same professionalism. As part of the maintenance program of the hydroelectric Tignes-Malgovert, EDF launched a site on the two bottom valves and brimballes (equipment that can move up and down the gates) of the Tignes dam. A first phase of preparation was to secure future work areas located high on the "balcony" of the dam (see photo). This intervention was nousd entrusted CITEM is specialized in the work of complex access.

 

Maintenance

 

Annual maintenance of all our books

Rockfall, avalanche, gazex, dams, roofs of factories, etc. ...

 

informations Maintenance

 

 


The administrator of the site is online now! Talk - ask your questions to webmaster